Management Options 
                                
                                    SWAT+ AW allows you to specify land use management options and reservoir management
                                    options. To do this fill the management sections in the config file as shown in
                                    Figure 4. To set the management for more than one land use, repeat the block with
                                    curly brackets with different landuse name and options inside them. To skip
                                    management options, delete or comment all the blocks with the curly brackets. The
                                    above procedure also applies to reservoir management options.
                                
                                
                                Figure 4: Management sections in config.py
                                 Land use Management Options 
                                
                                    To specify land use management options, first, set the target land use as seen in
                                    line 58 (Figure 4). Refer to the 
                                        SWAT+ documentation  for more details on land use
                                    types in SWAT+. Line 59 (Figure 4) shows the name given to the management schedule
                                    that will
                                    have the details for managing the selected landuse. If the user specifies a name
                                    that already exists in the database, SWAT+ AW will update it with the details
                                    specified here.
                                
                                
                                    Users can add automatic schedules that are already available in SWAT+ by specifying
                                    the name of the automatic schedule under "auto_sch1". The names of the automatic
                                    schedules are available in the lum.dtl file that is documented in the  SWAT+ documentation 
                                    available from
                                    the SWAT+ website. If there are more than one
                                    automatic schedules, they should be numbered sequentially.
                                    Mannual schedules can be added by
                                
                                
                                    Mannual schedules can be added by adding details under "op_sch". These need to be
                                    sequentially numbered too (Figure 4). For mannual schedules, the user will need to
                                    provide "op_typ (which is the type of operation to be carried out in the
                                    specified land use), date (which is the day and month when the operation is
                                    carried out), harvest_part (if the operation is harvesting, what part of the
                                    plant is harvested?) and rot_year (which specifies the number of years before
                                    operation is performed again - in a cycle)
                                
                                 Reservoir Management Options 
                                
                                    If the user needs to set up reservoir management make sure there is a reservoir in
                                    the model being set up. However, this needs knowledge of decision tables which are
                                    introduced in this video and in
                                        this paper .